Ram Air Engineering Logo. Ram Air Engineering, Inc. Working for you!
Gray Bar

Home Page. Services.Mission Statement.References.Contact Us.Ram Analysis.What's New.

Contractor's
License
#470556

 

Ramanalysis©
Putting Technology to work for you
Reliability Assured Maintenance System Analysis

Ram-1:Tri-Service-Scope of work

  • Perform SCAQMD rule 1415/EPA rule 608 required leak test utilizing electronic testing equipment
  • Perform oil analysis utilizing an independent Quality Assurance Laboratory (It is recommended by most manufacturers not to change oil, but to perform a trend analysis)
  • Perform refrigeration analysis
  • Perform vibration testing and analysis
  • Perform infrared temperature scanning of the following:
             Bearings on open drive motors
             MCC starter panel
             Control panel
  • Perform ultrasonic testing and analysis
  • Check and calibrate operating and safety controls
  • Check incoming line voltage using digital oscilloscopes to determine condition of incoming power
  • Change oil filter
  • Provide a detailed written report on all findings and conditions

Ram-2:Tri-Service-Scope of work

  • Perform oil analysis utilizing an independent Quality Assurance Laboratory
  • Perform vibration testing and analysis
  • Perform infrared temperature scanning of the following:
             Bearings on open drive motors
             MCC starter panel
             Control panel
  • Perform ultrasonic testing and analysis
  • Check and calibrate operating and safety controls
  • Check incoming line voltage using digital oscilloscopes to determine condition of incoming power
  • Provide a detailed written report on all findings and conditions

Ram-3:Tri-Service-Scope of work

  • Perform oil analysis utilizing an independent Quality Assurance Laboratory
  • Perform vibration testing and analysis
  • Perform infrared temperature scanning of the following:
             Bearings on open drive motors
             MCC starter panel
             Control panel
  • Perform ultrasonic testing and analysis
  • Check and calibrate operating and safety controls
  • Check incoming line voltage using digital oscilloscopes to determine condition of incoming power
  • Provide a detailed written report on all findings and conditions
  • Change drier cores on new purge systems if applicable Upon completion of each Tri-Service, a complete analysis report will be given on tests performed above. Report will consist of graphs, charts, data, and analysis of information. Test equipment is state-of-the-art IRD Vibration, Infrared, and Ultrasonics plus Flue 105-B Oscilloscope all with diagnostics software packages for 1998. Our Technicians are factory trained and are experienced in systems and analysis.

Testimonial:
I want to thank and congratulate your team for the outstanding service rendered by your highly professional staff and work team under contract with us. I receive many positive comments and thank you calls from our Boeing employees about the fast responses, diligent work and follow-up with them. More...

Ram Air gray bar.
Home  |  Services  |  Mission Statement  |  References  |  Contact Us  |  Ram Analysis  |  What's New
25172 Arctic Ocean  |   Suite 108  |   Lake Forest  |   California, USA  |   92630 |   949.588.6300  |   949.458.9100 Fax

©2006